In the chart below are several of the different tunnels which have been constructed in
Germany over the past several decades.
Location |
Description |
Tunnels |
Barriers |
Date built |
Number |
Length |
Diameter (cm) |
Approx. Cost - US$ |
Length ~ m. |
Height (cm) |
TK 319.3 Diepholz district L356 |
PVC Tube |
1 |
12 |
15 |
? |
200 |
? |
1980 |
TK 3220.4 Nienburg district K34 |
Circular concrete sections |
1 |
12 |
30 |
1,250.00 (+750.00 for barrier) |
87 |
45-50 |
May 1981 |
TK 3429.7 (?) Gifhorn district (Espen-Leu) |
? |
1 |
? |
? |
? |
300 |
? |
? |
TK 3529.4 Gifhorn district K114 |
Stell tube under road, concrete tube under side track |
1(+1 under side track) |
? |
Tunnel under road: 42 |
30,800.00 (incl. Barriers) |
200 |
50 |
Ca 1979 |
TK 3406.3 County of Bentheim district K14 |
Circular passage |
1 |
? |
? |
? |
Beginning of 1981 |
? |
30-40 |
TK 3815.2 Osnabruck district K216 |
Concrete tube |
1 |
? |
30-40 |
Altogether ~ 4,563.00 |
? |
30-40 |
April 1982 |
TK 3816.1 Osnabruck district (Depenbrock) |
Concrete tube |
1 |
? |
30-40 |
|
? |
30-40 |
April 1982 |
TK 3816.1 Osnabruck district (Sondermuhlen) |
Concrete tube |
1 |
? |
30-40 |
|
? |
30-40 |
April 1982 |
TK 3730.4 Wolfenbuttel district L629 |
Circular concrete |
2 (~ 11m apart) |
~ 8.5 |
35-40 |
~ 5,600.00 |
/ |
/ |
1979 |
TK 3830.3 Wolfenbuttel district L513 |
Circular concrete sections |
2 (100m apart) |
8 |
35-40 |
~ 5,600.00 |
200 |
? |
Spring 1980 |
TK3928.2 Wolfenbuttel district K81 |
Circular concrete sections |
2 (10m apart) |
~ 8 |
35-40 |
~ 5,600.00 |
650 |
~ 50 |
1979 |
TK 4028.2 Goslar district K32 |
Circular concrete sections |
2 (30m apart) |
~ 7 |
32 |
~ 3,025.00 |
/ |
. |
July 1980 |
TK 4324.2 Northeim district B241 |
Circular concrete sections |
1 (+1 under side ttrack) |
15 under road, 9 under track |
50 under road, 35 under track |
4,688.00 (incl. Barriers) |
120 |
~ 30 |
March 1979 |
TK 3828.2 Wolfenbuttel district (Aldersheim) |
Oval Brick Culverts |
1 |
~ 16 |
Height: ~ 120 width: 86 |
None |
/ |
/ |
/ |
TK 4122.2 Holzminden district |
Square concrete sections |
1 |
~ 9 |
54 |
None (barrier,1981: ~ 2,500.00) |
500 |
~ 40 |
/ |
The last 2 are presumably existant structures for water flow. A barrier was constructed
with the final project on the list to enhance its' desirability to migrating amphibians.